Sewage Water Works

Site A major water treatment works on the Mersey Ship Canal.

Objective The site was problematic and required upgrading to provide automatic control and monitoring from the centralised control room.

Solution A comprehensive survey of the site was undertaken with information extracted from both the existing PLC systems and defining of new monitoring locations.

We designed, manufactured and programmed a number of PLC interface units to collect data from a variety of existing equipment.

Notes The system was installed and commissioned to the client’s requirements on an accelerated program which was not achievable through the conventional framework routes. 

For all the latest news get connected with us.
Clayton Penistone Group, Westhorpe Works, Halifax Road, Penistone, Sheffield
South Yorkshire England S36 7EY

T: +44 (0) 1226 763130
E: mail@clayton-penistone.co.uk
Crafted by DMSQUARED