Site A potable water booster station.
Objective To install a new booster station to facilitate the decommissioning of a potable water service reservoir tower which had become unstable.
Solution The design, manufacture and installation of a complete M&E package complete with a motor control centre, dedicated standby generator, multistage potable water pumps and associated ancillary equipment.
Notes The installation required shutdowns to be undertaken at periods of low demands to allow for connection into the existing pumping main within a restricted time period.